Completed Project References
Selected projects supplied by GSM BuildTech across the Middle East, Southeast Asia, and Africa. All projects used insulated aluminum Great Wall roof panels manufactured at our Tianjin facility.
Logistics Warehouse — Riyadh Industrial Zone
| Roof area | 8,400 m² |
| Panel spec | 100mm PIR / 1.0mm / PVDF white |
| Port | Jeddah Islamic Port |
| Lead time | 32 days |
| Completed | Q3 2025 |
Temperature-sensitive logistics facility in 48°C summer conditions. PVDF white coating for maximum solar reflectance. Pre-shipment SGS inspection completed.
Factory Re-roofing — Dubai Industrial City
| Roof area | 5,200 m² |
| Panel spec | 75mm PIR / 0.7mm / PVDF light grey |
| Port | Jebel Ali (Dubai) |
| Lead time | 28 days |
| Completed | Q1 2026 |
Re-roofing replacing deteriorated steel sheets. Custom panel lengths to match existing purlin layout — no structural modification required.
Garment Factory — Binh Duong Province
| Roof area | 12,000 m² |
| Panel spec | 75mm PIR / 0.7mm / SMP white |
| Port | Ho Chi Minh City |
| Duty | 0% (ACFTA Form E) |
| Completed | Q2 2025 |
Interior temperature reduced ~7°C vs previous steel roofing, directly reducing A/C operating cost. Two 40ft containers shipped under ACFTA 0% duty.
Food Processing Plant — Bekasi, West Java
| Roof area | 6,800 m² |
| Panel spec | 100mm PIR / 0.7mm / PVDF white |
| Port | Tanjung Priok (Jakarta) |
| Lead time | 30 days |
| Completed | Q4 2024 |
Food-grade environment requiring strict hygiene and temperature control. PVDF white for easy visual inspection. Food-grade compliant interlocking seals.
Warehouse Complex — Lagos Free Trade Zone
| Roof area | 9,600 m² |
| Panel spec | 75mm PIR / 0.7mm / SMP light grey |
| Port | Apapa Port (Lagos) |
| Containers | 3 × 40ft |
| Completed | Q1 2025 |
Coastal Lagos environment — aluminum specified over steel for salt-air corrosion resistance. Container load optimization reduced per-m² landed cost by 12%.
Agricultural Processing — Nairobi EPZ
| Roof area | 4,200 m² |
| Panel spec | 75mm PIR / 0.7mm / PVDF white |
| Port | Mombasa Port |
| Lead time | 34 days |
| Completed | Q3 2024 |
Agricultural processing with strict export timeline requirements. Full shipment completed within 34 days including all export documentation and certificate of origin.
Working on a Similar Project?
Send project area, location, and spec — FOB pricing within 24 hours.
📧 sales@insulatedaluminumroof.com | 📱 WhatsApp +86 155 2274 6824





